Skip to content
Now piloting in North Vancouver

Know your rules, costs and permits before you hammer a single nail.

Enter an address to confirm the local government, see the legal parcel and municipal utility maps, and find out which authorities your renovation involves. Then share one plan with every pro on the job.

By creating an account you agree to the terms and privacy policy.

  • Free for homeowners
  • No credit card
  • Official BC open data

North Shore homes, kitchens and service upgrades

Built on public data from

  • BC Address Geocoder
  • ParcelMap BC
  • BC Municipal Boundaries
  • District of North Vancouver Open Data
Property intelligence

Architectural intelligence meets municipal governance

One lookup confirms the local government, draws the legal parcel and lays municipal utility and hazard maps over it, with the source and licence on every layer.

Real sample // ParcelMap BC

355 W Queens Rd, North VancouverDNV · Pilot area

Parcel outline · updated 2024-08-18

Property profile

Jurisdiction
District of North Vancouver
PID
024-990-949
Plan
LMP49434
Lot area
12,253 m²

Map layers in this jurisdiction

  • Property & cadastralParcel boundaries1
  • WaterMains, service connections, hydrants3
  • Sewer & drainageSanitary and storm mains, connections, drains5
  • Environmental & hazardsSlope, creek, streamside and wildfire permit areas4

Utility locations are approximate. Request a BC 1 Call locate before any digging.

One project, every role

Homeowner certainty. Contractor velocity.

The homeowner, designer, construction manager and trades share one plan, each with their own tasks and the permits they are responsible for.

For homeowners

Know what you are signing up for before anyone quotes.

  • Every authority, in orderMunicipality, BC Hydro, WorkSafeBC and BC 1 Call steps in one checklist.
  • Plan and budget firstScope, cost range and timeline you can bring to every contractor.
  • Compare quotes line by lineInvite pros to bid on the same scope and see the differences.

For contractors, designers & managers

Projects arrive with the site context already gathered.

  • Parcel and utilities on one mapWater, sewer, storm and hazard areas with the source on every layer.
  • Plans split by tradeTasks, schedule and materials your crew can work from.
  • Bids, change orders and punch listsKeep the paper trail with the project, not in your inbox.
Worked scenarios

Engineered for high-friction Pacific Northwest projects

One renovation in BC can involve four authorities. We start with the two projects where homeowners most often miss a step.

Lead use case

EV Level 2 charger & 200A service upgrade

Check whether load management can avoid the upgrade, then line up the permit, the BC Hydro request and the disconnect day.

  • Municipality

    Electrical permit

    Required

    The District and City of North Vancouver issue it. Pulled by a licensed electrical contractor, or by an eligible homeowner.

  • BC Hydro

    Service upgrade request

    Required

    Submitted by the electrician. BC Hydro schedules the disconnect and reconnect.

  • Municipality

    Building permit

    Sometimes

    Usually not needed. Flagged if the meter base or mast moves, or if trenching needs a BC 1 Call locate.

Typical cost
$3,000 to $8,000+ for the upgrade
Typical duration
2 to 8 weeks
Second use case

Open-concept kitchen & wall removal

Move the sink to an island and open the dining room wall, with the hazmat survey first so asbestos does not wreck the schedule.

  • WorkSafeBC

    Hazardous materials survey

    Pre-1990 homes

    Required before demolition in homes built before 1990.

  • Municipality

    Building & plumbing permits

    Required

    For the wall opening and the new island drain, vent and supply lines.

  • Municipality

    Electrical (and gas) permit

    Required

    New circuits and island receptacles; gas permit if the range line moves.

Typical cost
$50,000 to $90,000 for a layout change
Typical duration
8 to 20 weeks

Costs and timelines are planning ranges, not quotes. Permit needs are confirmed with each authority.

Coverage

Jurisdictional authority & coverage status

We only show municipal data we are licensed to use. Anywhere else in BC you still get the address check, the parcel and the provincial authorities.

Pilot // North Shore

  • Live

    District of North Vancouver

    Address, parcel and 12 municipal map layers: water, sewer, storm and four hazard permit areas.

  • Parcels only

    City of North Vancouver

    Address and parcel outline-solid today. City utility and hazard layers wait on a data licence.

  • General guidance

    Rest of British Columbia

    Address check, parcel outline-solid and provincial authorities. Local rules need a manual check.

  • Planned

    City of Vancouver

    Next after the pilot. Vancouver issues its own electrical permits, so it needs its own rules.

Pricing

Priced for single projects or high-volume builders

Homeowners start free. Professionals pay for the time the platform saves them, and a pro invited to a homeowner's project joins that project free.

Free for homeowners in the pilot

Homeowners

Free

$0during the pilot

  • Address check & property map
  • Permit checklist
  • Plan, budget & estimate
  • Invite your designer, manager and trades
  • Home history report
Coming after the pilot

Homeowners

Homeowner Pro

$15/ month

or $99 per project

  • Unlimited projects
  • High-resolution mockups
  • Bid comparison
  • PDF reports
  • Full home history report

Trades & designers

Pro Seat

$49/ user / month

  • Unlimited projects
  • Permit engine
  • Task management
  • Quote tools
  • Branded PDFs

Builders & firms

Team

$199/ month

up to 5 seats, then $35 / seat

  • Multi-project dashboard
  • Trade coordination
  • Bid leveling
  • Change orders
  • Resource scheduling

Prices in CAD and subject to change during the North Shore pilot.

Questions

Permits, coverage and pricing

Answers from the checklists, coverage and prices on this page.

Do I need a permit to remove a wall in North Vancouver?

The North Shore pilot covers the City and District of North Vancouver. Move the sink to an island and open the dining room wall, with the hazmat survey first so asbestos does not wreck the schedule. Hazardous materials survey (WorkSafeBC, Pre-1990 homes): Required before demolition in homes built before 1990. Building & plumbing permits (Municipality): For the wall opening and the new island drain, vent and supply lines. Electrical (and gas) permit (Municipality): New circuits and island receptacles; gas permit if the range line moves. The layout-change range shown is $50,000 to $90,000 for a layout change, over 8 to 20 weeks.

Does an EV charger and 200A upgrade need a permit, and what does it cost?

Check whether load management can avoid the upgrade, then line up the permit, the BC Hydro request and the disconnect day. Electrical permit (Municipality): The District and City of North Vancouver issue it. Pulled by a licensed electrical contractor, or by an eligible homeowner. Service upgrade request (BC Hydro): Submitted by the electrician. BC Hydro schedules the disconnect and reconnect. Building permit (Municipality, Sometimes): Usually not needed. Flagged if the meter base or mast moves, or if trenching needs a BC 1 Call locate. The upgrade range shown is $3,000 to $8,000+ for the upgrade, over 2 to 8 weeks. That range is the project cost on the checklist, not a separate permit fee.

Where does Domivue have municipal map data?

District of North Vancouver — Live. Address, parcel and 12 municipal map layers: water, sewer, storm and four hazard permit areas. City of North Vancouver — Parcels only. Address and parcel outline-solid today. City utility and hazard layers wait on a data licence. Rest of British Columbia — General guidance. Address check, parcel outline-solid and provincial authorities. Local rules need a manual check. City of Vancouver — Planned. Next after the pilot. Vancouver issues its own electrical permits, so it needs its own rules.

How much does Domivue cost?

Homeowners start free. Professionals pay for the time the platform saves them, and a pro invited to a homeowner's project joins that project free. Free (Homeowners): $0 during the pilot. Free for homeowners in the pilot. Homeowner Pro (Homeowners): $15 / month (or $99 per project). Coming after the pilot. Pro Seat (Trades & designers): $49 / user / month. Team (Builders & firms): $199 / month (up to 5 seats, then $35 / seat). Prices in CAD and subject to change during the North Shore pilot.

Pilot partners

Built with North Shore professionals

Local pros check every permit rule against real jobs before homeowners rely on it. Pilot partners get a free pro seat in exchange for their feedback.

  • 5 to 10 partners

    Electrical contractors

    Check the EV charger and service upgrade rules against real jobs.

  • 3 to 5 partners

    General contractors

    Test trade sequencing, bids and change orders on kitchen projects.

  • 2 to 3 partners

    Design firms

    Shape how drawings, mockups and structural notes flow to the team.

Enter your North Shore address to unlock your property intelligence report.

Free to start. Your address is only used to look up public map data for your project.